Ordering cement before the monsoon, and why it pays
Every year the same thing happens. The rain arrives, boats slip a week, and the sites that ordered late are the ones standing still.
How much steel a two storey house needs
The honest answer is that it depends on the drawing. But there is a sensible way to estimate it before the drawing exists.
Getting materials to an island without losing a week
The boat is rarely the problem. The manifest, the loading window and the order that arrives in three parts usually are.