HI Hirigaa Contractors Building in Male, Hulhumale and the atolls since 2009

Plumbing and drainage

First fix to final fix, roof tanks, pumps, pressure sets and drains that were tested before they were buried.

Pipe and fittings in PVC and PPR, roof tanks, pumps and pressure sets, soil and waste, and the drainage runs out to the connection.

Everything is pressure tested before it is closed up and the test is recorded with a date and a name. A first fix signed off that way is the difference between a leak found on a Tuesday and a leak found after the tiler has finished.

We size the tanks and the pump for how the building will actually be used rather than for the floor area. A guesthouse with eight showers running at seven in the morning is a different building from a house with the same number of taps.

Ask about this

Leave your details and we will reply with what it involves and what it costs.

We reply to every message. Leave a phone number if you would rather we called.

  • Where we are Plot 11242, Industrial Zone
    Hulhumale 23000
    Maldives
  • Call us +960 335 8820
  • WhatsApp 9607758820
  • Email us office@hirigaa.mv
  • Opening hours Site hours, Saturday to Thursday, 7am to 5pm Office, Sunday to Thursday, 8am to 4pm Closed Friday