Our work
A few of the jobs we have finished, and who they were for.
A kitchen for a flat with no lift
Twenty two feet of kitchen carried up five floors in sections, with a worktop that had to come up a stairwell in two pieces.
Eleven wardrobes for a guesthouse between seasons
Eleven rooms fitted out in nineteen days on an island, with everything cut here and assembled there.
Nine doors, no two openings the same
A house built in 1996 where every opening was a different size, and why standard doors would have been more expensive.
A kitchen saved rather than replaced
A nine year old kitchen with tired doors and sound carcasses, refaced in four days for a third of the price.