Harbour wall repair, Thulusdhoo

Marine grade materials for a repair that had to be done between tides, in two shipments.

Harbour wall repair, Thulusdhoo

A section of harbour wall that had lost its facing, with a working window between tides and no room for a second attempt.

Everything specified was marine grade, including the fixings, which is the detail that decides whether a repair like this lasts four years or fourteen. We shipped in two loads so the council was not storing bagged cement on an exposed quay for a fortnight.

The repair went in over nine working days.

  • Client Island Council
  • Finished 2024
  • Where Thulusdhoo