School hall rewiring, Villingili

A full rewire and new board, quoted off the load schedule and finished inside the holidays.

School hall rewiring, Villingili

An assembly hall on a board that had been added to for twenty years, and five weeks of school holiday to put it right.

We priced the job off the load schedule rather than off a materials list, which found two circuits that had been sharing a breaker since the hall was extended. New board, new cable, new fittings, and a set of as built drawings the school actually has a copy of.

Finished with a week of the holiday still to spare.

  • Client Villingili School
  • Finished 2024
  • Where Villingili